BuildingGreen Report

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Forum topic

Hi everyone,

We're pitching a green wall to a client for a project in NYC and are looking for recommendations on systems/companies.  We've done them locally, but the company we've worked with only services the Boston area.  There are so many companies out there now that we'd rather go with one that's recommended.  Thanks in advance for... Read more

Forum topic

Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more

Product Guide

Faucets with high flow rates waste water—not to mention the energy used to treat and deliver it to our buildings—and the additional water stresses our wastewater treatment systems.

Warnings Low-flow faucets may not be appropriate for every application. Where there are long pipe runs or large-diameter supply pipes, it can take longer for... Read more

Forum topic

Not a green design question but a green firm design question... Finalizing the renewal of our Just certification, we're taking a fresh look at all our benefits & policies. We have already reviewed industry-wide survey data (AIA and PSMJ) but are interested in how the firms we admire (i.e., *you*) are approaching benefits in the transformed... Read more

Forum topic

I'm so excited to share that the call for submissions is now open for 16cubits, a design festival and competition for the Jewish holiday of Sukkot, to take place at Berkeley’s Urban Adamah in October 2024.

Please share with anyone you think might be interested! Our hope is to create a forum for builders, designers, and architects to... Read more

Forum topic

Hello all, I would like to share an upcoming Virtual and In-Person conference for NOMA (National Organziation of Minority Architects).  Non-members can register, but I encourage anyone to join the organization to support the organization's mission.

"NOMA’s mission, rooted in a rich legacy of activism, is to empower our local chapters and... Read more

Forum topic

Does anyone know of a source for finding the operational solid waste generated by typical building/use types (weight/sf)? I couldn't find anything on LEED, True, or EPA. I found this table but isn't by sq ft for many of hte uses. Waste Generated by Industry and Building Type (wastecare.com)

Quiz

Welcome to the quiz portion of Five Reasons to Be Optimistic About Solar Energy!

Learning Objectives
Upon completing this course, participants will be able to:


Describe three ways how PV decreases environmental impact while increasing sustainability and health measures for communities.

Discuss PV life-cycle... Read more

Campus-wide Group

Forum topic

My dear collegues,

As I'm sure is true for many of us, the events of the past weeks (months/years/decades...) have emphatically reinforced to me the need for a radical shift in how we meaningfully address JEDI in what we do. One (admittedly small) step I've been thinking about are the statements of reconciliation that have become more... Read more

Forum topic

Good morning SDL,

I have a request for all of the supply chain labor folks out there… I would welcome hearing about your experience/stories/pointers you have based on your project work applying the DfF toolkit or other comparable supply chain labor efforts.

We have a socially minded client that is interested in Design for Freedom... Read more

Quiz

Welcome to the quiz portion of Video: Eight Steps to Success with LEED-EBOM.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Describe the first steps project teams should take when considering LEED-Existing Buildings: O+M.
2. Understand the steps and timeline ofthe LEED-... Read more

Author

Jerelyn Wilson’s work with BuildingGreen started in 1985 as an owner and member of the Board of Directors. Since then, her evolving roles have included HR Director, Outreach Director, and currently CEO. She is responsible for working with mid-sized to large architecture firms to implement sustainability education, as well as professional... Read more

Forum topic

Love the profile of Anica as the "featured member" on AIA's website--congratulations, Anica!

It's great to see the "just do it" attitude to achieving the 2030 goals: "We do not rely on clients to tell us to design a high-performance building; we are going to do it anyway, it's our job."

Forum topic

Hey group,

I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.

The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more