BuildingGreen Report

Basic page

Browse Our Knowledge Base Sustainable Materials Material Selection Material Transparency Avoiding Toxic Chemicals Efficient Use of Materials Reduced Manufacturing Impacts... Read more

Product Guide

Ground- and water-source heat pumps move refrigerant or water through the ground or a body of water for use as a heat source (for indoor heating) or heat sink (for indoor cooling).

BuildingGreen-Approved Heat Pumps

BuildingGreen approves:

super-efficient commercial systems residential ground- and water-source heat pumps that... Read more

Forum topic

If anyone else has gotten confused going between parts-per-million and percentages (parts per hundred!) for material reporting here's a little infographic that might help. Feel free to use or improve! 

Quiz

Welcome to the quiz portion of The Four Core Issues to Tackle for Resilient Design (And the Programs That Can Help).

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Use site-specific hazard analysis to evaluate a project’s resiliency demands.
2. Use climate change data to... Read more

Peer Network Event

Forum topic

Here's the Core Purpose for this group that came out of the Inaugural Summit.

We're off and running!

Author

Hans “Grumpy” Grimm

Forum topic

Hi SD Leader: Please review, consider or pass along this terrific new position leading the Sustainability strategic direction at the Washington University School of Medicine. WashU has an ambitious sustainability leader role regionally and across the nation and the School of Medicine (highly ranked nationally) plays a big role in that. The job... Read more

Forum topic

Hi Everyone, 

Our Vancouver team is looking for some innovative, high performance  building retrofit case studies. We are have been retained to retrofit a significant heritage building in Vancouver and the client has a net zero carbon institutional goal. As such we are looking for some innovative precedents that will provide design and... Read more

Team Group

Forum topic

Hi everyone! I'm extremely pleased to be back in this group after a couple of years out and I'll spare no time in spamming your inboxes. 

MASS is working with UT Austin to help them evaluate their campus buildings for reuse firstly and then deconstruction and material reuse. Their campus, as with most campuses, is constantly being built... Read more

Forum topic

Asking for a colleague:

"Have you ever had a large number of fire retardant tarps used to temporarily enclose a building during construction? Do you know of any solutions for recycling/reusing them or another product that doesn't use toxic fire-retardants that meets the performance criteria?"

I think we've all seen poly or fabric... Read more

Campus-wide Group

Forum topic

Dear All!

Crowdsourcing here to see if anyone has access to two LCA's that can be used to compare functionally equivalent consumer products: a fossil fuel powered to a battery one?  (A good product might be a car or stove, or a heating system with a boiler compared to a heat pump, perhaps?  Needs to include the B-use phase probably...)... Read more

Forum topic

Hi folks,

I hope you've seen the plug to sign onto the letter that's generated a flurry of messages on Green Gurus--I also emailed it out directly to everyone. We've got lots of architects on board, and a handful of engineers, but I think we just have one contractor so far (Thanks Theresa!)--it would be really awesome to have more.

... Read more

Forum topic

Dear Colleagues:

If you are short on time, here is the executive summary:

Time to make healthy trouble and sign a petition today to the WHO to urge them to recommend the implementation of best practice healthy air guidelines in light of the recent studies showing a direct link between the spread of COVID-19 through aerosol... Read more

Forum topic

Hi folks,

For those in the SD Leaders network, here's a reminder about the webinar this Friday at 2:00 eastern time. I hope you can join us!

For other Green Gurus, you're welcome to join in, get a preview of the report, and learn about what happened at the SDL Summit at Gulf State Park, in Alabama (fortunately, NOT near where the... Read more

Forum topic

I'm sure most (if not everyone) is aware that LEEDv5 is under public review until May 20, 2024. I know I need to make time to flip through it, review, and comment, but I'm having a heckuva time protecting the time in my calendar to do that. Anyone interested in joining me for a 60 - 90 minute meeting to do this together as an accountability... Read more

Product Guide

Board insulation has good thermal performance ranging from about R-4 to R-8 and is used as an integral part of a building envelope’s continuous insulation system.

Because board insulation is used on the building exterior, it is not always subject to the same material health and emissions requirements as batt insulation used inside the... Read more

Quiz

Welcome to the quiz portion of Fundamentals of High-Performance Building Assemblies.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Recall how the acronym ENDURE speaks to the unifying aspect of high-performance buildings.
2. Describe how to apply the principles of high-... Read more