BuildingGreen Report

Forum topic

Hi All,

Jacob Knowles from BR+A reached out with a request and I’m passing it on to you all.  Jacob’s contact info is at the bottom of this so you can respond to him directly or respond here and I’ll forward it on:

We are working on assembling examples of large wet lab buildings that employ strategies to greatly reduce fossil... Read more

Author

P.J. is an accomplished writer and speaker who brings passion, humor, and discernment to all her work.

Whether it’s a spotlight report on decarbonization, a webinar on ESG, or just a chummy email bulletin, she is ferociously committed to truth, accuracy, and thoroughly... Read more

E-Product Display

Product Guide

Discarded tires are an environmental disaster, and finding a beneficial use for them is a high priority.

BuildingGreen-Approved Resilient Flooring

BuildingGreen does not approve any flooring product that is made with tire-derived rubber, though some products may be appropriate for exterior use.

Environmental and Health Impacts of... Read more

Forum topic

We just had a planning call for the tour, and I’m more convinced than before that: a) we picked a great location for this year’s Winter Summit and b) you won’t want to miss this tour!

Alabama’s Gulf State Park got a big infusion of funds from the BP Oil Spill (that’s an interesting story in itself), and now has some amazing new... Read more

Peer Network Event

Campus-wide Group

Forum topic

As some of you know, BuildingEase is the first (FREE) platform focused on building products that combines a workflow tool, waste exchange and marketplace (yes, you actually buy it all right from the site!).

The platform saves tons of hours, major headaches and streamlines workflow within a firm and across a team.

We are going to... Read more

Forum topic

Hello,

We have a mass timber purpose-built rental project specifying flooring at the moment and are trying to find a healthy flooring option while managing acoustics with CLT floorslabs. We don't typically spec vinyl flooring due to the health concerns around PVC, but the project is budget-conscious, and our flooring supplier is... Read more

Forum topic

We all know the climates are shifting, and the ASHRAE standard that gets invoked for energy codes is shifting along with them--though not in perfect sync.  Louisiana is leaping from ASHRAE 90.1-2007 energy code to 2021 IECC (boom!).  The 2021 IECC as published uses relatively old climate maps; for Louisiana, at least, the same as the 90.1-2007... Read more

Forum topic

I'm writing an article surveying and comparing various embodied carbon tools, including whole-building LCA tools. I'm looking for interviewees who have used at least TWO of the three major LCA tools currently in use in North America (Tally, Athena IE, and One Click LCA). If you've tried all three, all the better! If you or someone in your firm... Read more

Quiz

Welcome to the quiz portion of Retrocommissioning: Big Savings for Big Buildings.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define the term retrocommissioning.
2. Explain how whole-systems RCx differs from energy-focused RCx.
3. Describe several examples of how... Read more

Forum topic

AIA is looking for additional technical review jurors for their 2022 COTE Top Ten Award program particularly in the Water/Ecosystems and Energy/Discovery categories.  If you are interested please go to this webpage and complete the form.

Time is of the essence, so please complete the form no later than Friday, January 14, 2022.

Forum topic

Mithun has a part-time employee Jake Minden who is a graduate student at the University of Washington. Jake is participating in a year-long research fellowship focused on equitable design practice. He has developed a survey to collect perceptions of workplace culture. 

Please consider taking 10-minutes to help gather this valuable... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Campus-wide Group

Product Guide

Durability is the first priority for roofing membranes since interior repairs and replacement waste material, time, and money.

BuildingGreen-Approved Roofing Membranes

BuildingGreen approves:

best-in-class TPO membranes from companies that support enhanced heat testing and show proactive attention to performance EPDM products... Read more

Forum topic

All,

For those who tuned into the Green Gurus presentation earlier this week, there was a question that came up during my presentation on NZE/NZC programs regarding whether ILFI allows the offsite renewable energy exception for LBC and Energy Petal projects (as opposed to NZE or NZC). I just double checked with them and it turns out they... Read more

Quiz

Welcome to the quiz portion of Lighting Design for Health and Sustainability: A Guide for Architects​!

Learning Objectives
Upon completing this course, participants will be able to:


Describe how high-quality lighting design dovetails with sustainability by improving energy efficiency and supporting occupant health and... Read more