Forum topic
Hello, fellow SDLs,
I wanted to share an opportunity for you - or those in your network - to join a passionate team of architects and designers based in Anchorage, Alaska. I'm told that you'd be asked to join the full team in Anchorage a few times a year for team building events but otherwise you can WFW (work from wherever!).
I... Read more
Basic page
Is your team working on a LEED v4 or WELL project?
Finding products for these projects is daunting, and even when you find products you believe will meet the requirements, you have to know exactly... Read more
Product Guide
Solvents and other hazardous ingredients contained in flooring adhesives can pose a significant health risk and compromise indoor air quality.
BuildingGreen-Approved Flooring Adhesives
BuildingGreen approves flooring adhesives that
exceed South Coast Air Quality Management District (SCAQMD) 1168 VOC content limits and also... Read moreForum topic
Here is a fundamental question regarding measuring operational carbon emissions that I'm sure many of you can clarify for me: Let's say you are considering design options and you want to know the relative contribution of GWP of adding an additional inch of continuous insulation to the building envelope. The GWP from embodied carbon will... Read more
Forum topic
Happy Friday Everyone!
Hoping to add a bit of excitement to the end of your week:
Here is the Sustainable Construction Leaders 2020 Summit Report.
Enjoy!
RoseAnn for Candace, Nadav, and the BuildingGreen team
Author
For more than 30 years, Alex Wilson has been the most trusted voice on energy efficiency and environmentally responsible design and construction. Since launching Environmental Building News (EBN) in 1992, he’s built a reputation, resources, and staff to provide the foundation for BuildingGreen, a consulting and information company... Read more
Forum topic
Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.
As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more
Forum topic
Hi All, I was initially reluctant to share this, but I've seen similar posts and I think it's in line with our mission and interests so I'll go ahead with it.
Tomorrow 12/9 at 1 PM EST I'm moderating a panel of industry leaders in public health (as it pertains to buildings), construction finance, and project development to review the... Read more
Forum topic
My name is Douglas Flandro. I am the sustainable design leader at CambridgeSeven in Cambridge, MA. I started my career in film and theater design. I moved into museum exhibit design with a graduate degree in interior architecture at the Rhode Island School of Design in 2003. I still design museum exhibits for science museums, nature visitor... Read more
Forum topic
Hi friends,
We recently tracked our water consumption on site during the structural demolition of some existing reinforced concrete buildings. The new OSHA silica regulations required us to keep dust to virtually zero, so we had a bunch of mist cannons and water hoses pumping water around the clock. We consumed ~855,000 gallons in a... Read more
Forum topic
Hi All,
Has anyone successfully adopted a Revit to ClimateStudio workflow with their new export tool? Right now we are using cove.tool because it works reasonably well with iterative Revit modeling, but are itching to try a more accurate and nuanced alternative.
Thanks for any and all experiences!
Misha
Forum topic
Resilience Resource Database
The Defining and Measuring Resilient Outcomes Working Group has been developing a Resilience Resource Database as a repository for resources related to the topic of resilience in our built environment.
This database and map are endeavoring to show resources for resilient design across the country to... Read more
Forum topic
The Water Sub-Group met today. This group is working on three items:
1. Project Water Plan Template
2. Project Water Tracking Form Template
3. Research and Resources Document
The Meeting minutes are attached. The next meeting is 5/19/20 @ 2:30 PM CST, via webex and teleconference. Please contact me if you would... Read more
Forum topic
Hello everyone!
My role at Sundt Construction is both a Preconstruction Project Manager, and Chairman of the company's sustainability committee. I've been involved in green building since 2001 and have been in leadership roles in both the Arizona and Minnesota USGBC Chapters. I look forward to being an active member of this group.... Read more
Forum topic
The Path to Zero Carbon is a series of rigorous, deeply researched white papers produced by Kjell Anderson and others at LMN Architects in collaboration with subject matter experts from across the industry--including some of you! Architecture 2030 is exploring capacity and funding needs to host and convene experts to regularly update the series... Read more
Product Guide
Wood decking requires potentially hazardous preservatives and stains, and plastic waste is a significant environmental problem.
BuildingGreen-Approved Decking
Composite decking approved by BuildingGreen has at least 50% total recycled content. For plastic decking, post-consumer content has to be greater than 50%.
Health and... Read more