BuildingGreen Report

Quiz

Welcome to the quiz portion of Can We Replace Foam Insulation?

Learning Objectives
Upon completing this course, participants will be able to:


 

1. List four ways in which foam is environmentally problematic and provide four examples of foam replacements.
2. Discuss the industry's relationship with foam... Read more

Author

Forum topic

We are excited to share the REPORT from the 2019 Small Firm SDL Summit held in Las Vegas on June 5th. Take a look and use this forum to post questions and comments that will allow us to engage our new members as we continue the valuable conversations begun at the Summit. As you will read in the introduction, we know that collectively small... Read more

Forum topic

Hi,

I selected a new background photo for the home page (the previous one was the same as on LEEDuser.com). I found the photo here:

https://www.pexels.com/photo/low-angle-shot-of-building-1029618/

I needed to find something low-contrast that wouldn't compete with the text. I initially tried some of the stock photos... Read more

Forum topic

Hello everyone!

My role at Sundt Construction is both a Preconstruction Project Manager, and Chairman of the company's sustainability committee. I've been involved in green building since 2001 and have been in leadership roles in both the Arizona and Minnesota USGBC Chapters. I look forward to being an active member of this group.... Read more

Forum topic

Hi all - back in May I asked you for help reviewing our series ahead of publication. The first 5 posts are up, with the 6th a day or so away. Thanks to everyone who has helped out! 

It's a fail-forward effort to help us figure out what we are missing in our climate action on our projects and advocacy. Enjoy, and let me know if and how... Read more

Forum topic

All,

We are collecting examples of buildings that involved electrification initiatives (building does not need to be all electric as long as largely electric). Please share your projects with us through this short survey. It will take 8-10min to complete.

The study will culminate into a report and best practices to advocate for... Read more

Product Guide

Standard HVAC systems require large fans and ductwork to move conditioned air throughout a building, which wastes energy and building space.

BuildingGreen-Approved Chilled Beams

BuildingGreen lists chilled beams that rely on water and smaller ducts to provide HVAC throughout a building.

Performance and Health Considerations... Read more

Forum topic

Hello Sustainable Community Design Leaders,

Now that everyone invited to the SCDL calls has access to this forum, I want to shift us over here for announcements and reminders, so here's your reminder that this month’s call is next Monday, March 21st, 11am–12pm ET (8-9am PT). Back to our usual time!

You can view the agenda here.... Read more

Forum topic

Hi All,
We have a date and time for the next SCL Carbon Working Group Meeting, "see" you there:

Topic: SCL Carbon Working Group Mtg #2
Time: Mar 31, 2020 09:00 AM Pacific Time (US and Canada)

Join Zoom Meeting
https://sellen.zoom.us/j/595221970

Meeting ID: 595 221 970

Dial in info:
        +1... Read more

Forum topic

Help. I have a contractor in need of advice on IAQ testing agencies and I'm largely uninformed about the local market of IAQ testing agencies. Anyone have organizations they'd specifically recommend or not recommend?

Feel free to email me directly if you'd prefer - awilson@ayerssaintgross.com.

Aley

Forum topic

Hi All! 

We have had a few multi-family projects consider this single package vertical unit with integrated ERV, but we haven't pulled the trigger for fear of the unknown. Our local engineers aren't sure how it actually performs and worry it may not meet code requirements for separation between exhaust and intake. Has anyone else used... Read more

Forum topic

Within the confines of the BuildingGreen safe space, I wanted to share the Forced Labor in the Building Material Supply Chain Mitigation Framework I shared at the 3/1 First Friday Fika. The intent is for this document to become public, but we are working through some permissions and final editing logistics. The project was collaborative... Read more

Basic page

Hurricane Tests Resilient Design—and Family Dynamics

A building project brings brothers back together, but a fast-moving storm challenges the project and the family.
Of storms & chins »

New Occupational Hazard Threatens Unshod Office Workers

Whistleblowers alert state health agencies to possible foot fungus scourge... Read more

Forum topic

Hi Green Gurus!

I am trying to find a source for this chart/graph illustrating the relative cost of design and construction versus the long term operational and occupant costs. Any thoughts are appreciated.

yours,

jp

Forum topic

Hello Green Gurus!

The Climate Smart Wood Working Group would like to give a boost to this Ecotrust initiative to support the market proliferation of mass timber with science that attributes carbon impacts to wood building products. As many of you are aware, a couple years ago, the University of Washington partnered with Ecotrust to... Read more

Team Group

Forum topic

Hi All!

Our company recently rolled out a corporate Green Team of volunteers across the company working to drive sustainability initiatives at their respective office locations. I wanted to reach out and ask who has a Green Team (or similar name) at their company and learn more about how different Green Teams are structured within the... Read more