BuildingGreen Report

Author

Pumpy Nullifidian

Forum topic

Hello everyone,

Here's a reminder that our next monthly call will be taking place next Tuesday, October 8th at 2:00pm EST.

Please feel free to join us!

Join Zoom Meeting - I double-checked this link and it is correct!

https://zoom.us/j/248664490

One tap mobile
+16699006833,,248664490# US (San Jose)... Read more

Forum topic

HI All,

I am curious if others are using THERM in-house for your envelope design?

We usually use our building envelope/curtain wall consultants (Boston - so mostly RWDI and Heintjes) but our teams are finding that they need the information faster than our consultants can provide, they are backlogged, or we have some curtain wall... Read more

Forum topic

Greetings!

Ayers Saint Gross is in search of a Sustainable Design Coordinator to join our team. This person is anticipated to sit in any one of our offices - Baltimore; Washington, DC; Tempe, Arizona; or Austin, Texas. Fit and skillset are more important than geography. The position is anticipated as full-time, but if the right candidate... Read more

Forum topic

Like everyone we’re struggling with the tight labor market. We’re not looking to poach. What we have found previously are individuals that have a passion for high-performance buildings but aren’t working on them in their current role for one reason or another.

Openings include:

Project Manager              3-5 years’ experience on... Read more

Forum topic

Hello friends, Posting this to help out a friend that you all know!

(please reply directly to Kira at her email below) Tx

Dear Gurus, 

I am curating/hosting a panel at CarbonPositive RESET:

DESIGNED FOR CLIMATE: A New Construction Showcase

North & South America: September 8, 2020 | 4:45-5:25pm (PST)

... Read more

Reports, Courses, Study Guides, Live Webinars

How much will it cost to achieve LEED v4 certification?

“We’d love a green building, but can we afford it?”

“We’re required to be LEED Silver, but we’re not sure how to get there under the new rating system.”

“Sure, we’re interested in LEED, as long as it doesn’t cost extra.”

LEED v4 and cost uncertainty

With... Read more

Forum topic

The AIA conference is coming up soon as well.  It is scheduled for June 19-23 in NYC. I have heard about a lot of great sessions and I am thinking it would be helpful if we could collect info here.  Please respond to this message with info about your session and I will compile all of this into a handy reference document.  I will start with my... Read more

Product Guide

Prefabricated, or modular, buildings can provide environmental advantages over conventionally constructed buildings. They are built in factories where manufacturing and cost can be tightly controlled, so materials are kept out of the elements, there is less waste, and thermal properties and air sealing can be enhanced. There are also fewer... Read more

Forum topic

Hi Sages,

Thanks to those who filled out the survey and helped set our agenda for Monday's meeting. We know that this time doesn't work for everyone (no time could, of course), so we'll be alternating times each month. The April meeting will be Thursday, 4/11 at 3:00 eastern.

The agenda is here. It also has the Zoom link (in case... Read more

Forum topic

All--

I haven't been part of this group in a while, but I'm excited to have rejoined recently. Some of you know that I joined HMC last year as Chief Impact Officer. I oversee design, sustainability, research, and communications for the firm, which has 300 people in 6 offices in California. We were founded in 1940 with a mission to serve... Read more

Forum topic

I am excited to share with you the final draft of the letter back to LP50 manufacturers.  The LP50 manufacturers sent their “Closing the Loop on Product Transparency” to design firms earlier this year.  For more background information, please check out Chris Hellstern's original August 20th post on this Green Gurus forum.  When we posted the... Read more

Forum topic

The LBC v4.0 materials imperatives for Responsible Materials (Core) & Responsible Sourcing require a majority of wood materials (by cost) to be FSC. Sure. But what is - or isn't - considered wood? The Clarification page for the imperative's scope and a key definition poses a perplexing conundrum: 

"All wood included in the Materials... Read more

Team Group

Product Guide

Caseworks can be made from unsustainable wood and other materials, and with adhesives and finishes that offgas formaldehyde and other hazardous compounds.

BuildingGreen-Approved Casework

Approved caseworks are:

made from FSC-certified wood or rapidly renewable materials verified as low emitting using CDPH Standard Method or a... Read more

Forum topic

Hi - we're working with the University of California Office of the President to put together low-carbon case studies. The two types we are looking for now include 1) a low-carbon TI (not a full building gut/renovation), and 2) any that involve the circular economy (in this case not just building reuse but product reuse) which could include... Read more

Quiz

Welcome to the quiz portion of Introduction to Fitwel Certification: On-Demand Webcast.

Learning Objectives
Upon completing this course, participants will be able to:


1.  Identify the different categories within Fitwel and the particular human health and wellness aspects.

2.  Describe the differences between Fitwel... Read more

Forum topic

Hi! Over the last 10 years, the firm where I work in Boston has predominately designed housing & senior living projects in the the Boston Metro region, with the occassional project in NH, CT, RI, and NY. We have built projects as far south at DC, but never designed anything to my knowledge in California in our 55 years of operation. A... Read more

Author