×

Error message

  • The specified file temporary://filejsRSoI could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileEceeum could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileiL0rXN could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileM2QNpv could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileNy9mpt could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

News Brief

NREL Publishes Six Case Studies

The National Renewable Energy Laboratory (NREL) has published detailed case studies of the energy performance of six buildings as part of its evaluation for the U.S. Department of Energy. Each case study compares measured energy use to the project’s design goals and identifies successes and lessons learned. The six projects are the Zion National Park Visitor Center, the Adam Joseph Lewis Center for Environmental Studies at Oberlin College, the NREL Thermal Test Facility, the BigHorn Home Improvement Center, the Cambria Office Building at the Pennsylvania Department of Environmental Protection, and the Chesapeake Bay Foundation Philip Merrill Environmental Center. All six reports are online at www.nrel.gov/publications/ (search by project name). Case studies of all six projects are also included in the BuildingGreen Suite.

Published August 1, 2005

Boehland, J. (2005, August 1). NREL Publishes Six Case Studies. Retrieved from https://www.buildinggreen.com/newsbrief/nrel-publishes-six-case-studies

Add new comment

To post a comment, you need to register for a BuildingGreen Basic membership (free) or login to your existing profile.