×

Error message

  • The specified file temporary://fileuJQngM could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileUvRVVZ could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileKuZ6Tf could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileWNwEqG could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file9enEkZ could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

News Analysis

GSA Links High-Performance Outcomes to Integrated Design

Project teams appear to function better, and their buildings end up greener, under collaborative project delivery.

Experts have long advised that an integrated design process is needed to take us to the next level of green design, but so far there’s been sparse analysis tying it directly to better performance outcomes. The number of case studies available is still small, but three recent U.S. General Services Administration (GSA) buildings that were designed and delivered by integrated teams provide a rare opportunity to compare against GSA’s conventional projects with similar programmatic goals.

The comparison, authored by Renée Cheng of the University of Minnesota, shows that the integrated teams definitively delivered greener buildings.

Published June 30, 2015

Pearson, C. (2015, June 30). GSA Links High-Performance Outcomes to Integrated Design. Retrieved from https://www.buildinggreen.com/news-analysis/gsa-links-high-performance-outcomes-integrated-design