BuildingGreen Report

Sales page

With this special offer, you’ll get the Spec This Not That Report at the reduced price of $89, a $40 savings. Avoiding Toxic Chemicals in Commercial Building Projects


Can furniture be hazardous? You bet it can…

From flame retardants in foam cushions to unnecessary stain and dirt repellents on upholstery materials, everyday... Read more

Campus-wide Group

Forum topic

We have a client thats going through a TI remodel in a building thats a LEED Core+Shell certified building. One of the questions we are trying to figure out is are there things we need to be doing to not imperil the building's certification. 

I think the answer is that the landlord had to write tenant guidelines at the time of... Read more

Forum topic

Hi folks,

Here's the next Peer Networks private webinar. As usual, it will be recorded and shared in the network if you can't make it in person:

Thursday, July 18, 2pm EDT (11am PDT)

The Center for Active Design (CfAD), operator of the Fitwel Certification System, recently launched Fitwel v2.1, which advances a vision where... Read more

Forum topic

Hi all,

Due to the eclipse, Nadav and I will be out on our usual call day, April 9th, and we anticipate others may as well. We will be moving the call to Tuesday April 16th at the usual time (2-3pm ET). For this meeting, we'll be holding a whiteboard session about MEP2040, the development of plans to achieve it, and tactics to getting... Read more

Reports, Courses, Study Guides, Live Webinars

Design assemblies that live up to their potential Course developer Peter Yost explains how high-performance assemblies are fundamentally different from traditional building assemblies.

High-performance buildings integrate site-responsive orientation, climate-responsive form, hefty R-values, efficient mechanical systems, healthy... Read more

Forum topic

Hi all,

Just like many of you, our firm is dedicated to increasing representation in the professions and through its relationship to the AIA Large Firm Round Table was able to access a National Organization of Minority Architects Fellow this summer. We’re loving our work with Himesh thus far, but it’s unclear whether we have the workload... Read more

Forum topic

Dear all,

On a major renovation where the wall R-value/U-value needs to be brought up to energy code, specifically a mass wall situation, does anyone have insights on how the situation is best dealt with? On the project in question for me, the continuous insulation might have to be added to the inside surface of the mass wall and there... Read more

Quiz

Welcome to the quiz portion of Climate Analysis for Architects (recorded webcast).

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Access climate data.
2. Choose appropriate design energy simulation tools.
3. Know when and how to run analyses with projected weather data... Read more

Product Guide

Discarded tires are an environmental disaster, and finding a beneficial use for them is a high priority.

BuildingGreen-Approved Resilient Flooring

BuildingGreen does not approve any flooring product that is made with tire-derived rubber, though some products may be appropriate for exterior use.

Environmental and Health Impacts of... Read more

Campus-wide Group

Forum topic

The Resilient Outcomes Working Group grew from a session at the 2020 Winter Summit in Gulf Shores AL, and we are still going strong.  We are currently focused on three primary objectives: 1) bringing awareness to resilient design through a presentation at the GreenBuild 2024 Resilience Summit (we'd love to see some peer network friends at our... Read more

Forum topic

I received the following email from Naajia at Southface.  I'll be out of town until November 8, but I'll see if there's time for me to address at least the second part before I leave:

A question regarding the BIT-User Forum was brought to my attention by a participant. Apparently when you are posting a question and you pick your location... Read more

Author

Andrea first became familiar with BuildingGreen in 2010 when she and her husband moved to Vermont and built their own passive house from the ground up. BuildingGreen’s president Nadav Malin heard about the project and asked if the staff could take a tour, and the rest is history. She joined the BuildingGreen team part-time in 2011 to work on... Read more

Forum topic

For those that missed Z's subtle mention of this a few weeks ago, Bora finally decided sustainability is important enough to have someone dedicated full-time to it, and then went out and got one of the best:

https://bora.co/bora-hires-sustainability-director-corey-squire/?tax=all-posts

I've been sharing Corey's thoughts on... Read more

Forum topic

I can hear Kjell saying "All models are wrong, but some are useful." Having said that we are having trouble getting usuable predictive energy use information from our electrical design engineer. They are telling us that their energy models are not for accurate pEUIs but just to compare various scenarios. Are they being lazy? Should we push for... Read more

Forum topic

First, special shout out to Carolyn Day from Perkins Eastman for getting permission to use their Pro-zoom account for this Greenbuild wrap-up social session, because...frankly...Greenbuild just wasn't the same without all of you.

So, while we can't be together in person, that doesn't mean we are stuck by ourselves. Grab a refreshment and... Read more

Forum topic

HI All,

I am curious if others are using THERM in-house for your envelope design?

We usually use our building envelope/curtain wall consultants (Boston - so mostly RWDI and Heintjes) but our teams are finding that they need the information faster than our consultants can provide, they are backlogged, or we have some curtain wall... Read more

Forum topic

HI All,

Really hoping to get some insight from all you wonderful people on how the Sustainability teams are set-up in your construction companies. As mentioned in my introduction post, I am the first ever Sustainability Engineer hired by my company.....until now all the work was handled by project teams. Which worked for them in the... Read more