Forum topic
On LEEDuser we divide checklists into multiple project phases. Specifically:
Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic designHow many of these phases are relevant for BIT best practices?
Note that we also... Read more
Forum topic
Hi All, I was initially reluctant to share this, but I've seen similar posts and I think it's in line with our mission and interests so I'll go ahead with it.
Tomorrow 12/9 at 1 PM EST I'm moderating a panel of industry leaders in public health (as it pertains to buildings), construction finance, and project development to review the... Read more
Forum topic
We are working on a multi-family project in Hartford that is townhouse style so each unit has an exterior door. The client has requested electronic key fob hardware. Has anyone had experience with retrofitting a passive house door with electronic hardware or have they used a door that is already fitted with electronic hardware?
Author
As BuildingGreen’s Content & Data Wrangler, Fran is a spreadsheet and content-management wiz who:
crunches data for our consulting team’s product vetting works internally and with our education partners to manage our continuing education program supports the editorial team with Drupal magicFran also compiles data submissions... Read more
Forum topic
Hello Green Gurus,
A close colleague of ours, Frances Yang of Arup, is distributing a survey developed in partnership with the Healthy Building Network (HBN).
The survey asks for which product categories you need more health information. Answers will help inform which product categories HBN next incorporates into its HomeFree and... Read more
Forum topic
Hi SMEP Leaders,
Our next monthly call is Tuesday, June 13 at 2:00 pm Eastern.
We've had a great series of conversations over the past year kicked off by short presentations from you all: interesting projects, confounding questions, emerging technologies and design strategies. It would be great to line up some more of those for... Read more
Forum topic
Hi All,
Has anyone successfully adopted a Revit to ClimateStudio workflow with their new export tool? Right now we are using cove.tool because it works reasonably well with iterative Revit modeling, but are itching to try a more accurate and nuanced alternative.
Thanks for any and all experiences!
Misha
Basic page
Forum topic
Hi all - I wanted to see if anyone will be in the Chicago area for the upcoming ASHRAE conference (21-23rd) and is interested in an informal meet-up? Or if you aren't going but are already in the Chicago area? Let me know and I'll see if we can organize meet-up!
Forum topic
Overland Partners is looking for a Sustainable Design Analyst with 2+ years of experience working with teams to implement sustainability strategies and building performance simulation.
More details here: https://www.overlandpartners.com/careers/sustainable-design-analyst/ Please pass along if you know of someone who may be a good fit... Read more
Forum topic
Hi friends,
We recently tracked our water consumption on site during the structural demolition of some existing reinforced concrete buildings. The new OSHA silica regulations required us to keep dust to virtually zero, so we had a bunch of mist cannons and water hoses pumping water around the clock. We consumed ~855,000 gallons in a... Read more
Forum topic
My dear collegues,
As I'm sure is true for many of us, the events of the past weeks (months/years/decades...) have emphatically reinforced to me the need for a radical shift in how we meaningfully address JEDI in what we do. One (admittedly small) step I've been thinking about are the statements of reconciliation that have become more... Read more
Forum topic
Hey group,
I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.
The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more
Forum topic
Section 901.5.1.3 of the 2018 IgCC includes a requirement that "A critical review shall be performed by an external expert independent of those performing the LCA." I'm curious as to what other's experiences are with having an external expert review an LCA - how does one find such an expert? Do you have any favorites that you'd recommend? ... Read more
Sales page
Join our free Coffee Talk with Alex Spilger to discuss the latest WELL AP v2 exam. Hear what's new in this latest version, what to look for, and what to remember.
Alex combed the WELL Building Standard reference materials and took the v2 exam in writing an extensive exam prep guide. Hear about... Read more
Forum topic
Love the profile of Anica as the "featured member" on AIA's website--congratulations, Anica!
It's great to see the "just do it" attitude to achieving the 2030 goals: "We do not rely on clients to tell us to design a high-performance building; we are going to do it anyway, it's our job."
Product Guide
The opportunity for water savings from installing efficient toilets, and from toilet replacement, is significant. In addition to improvements to the traditional gravity system, pressure- and vacuum-assisted flushing systems are available that offer superior performance—albeit often with some increase in flushing noise.
Cautions Certain... Read more