BuildingGreen Report

Forum topic

First, there was Energy Use reductions

Then there was embodied carbon

Soon it will be refrigerant use/leakage calculations

…and much more

As coordinators and leaders of project teams, what does this look like for the practicing architect and our collaborators?

I have no idea. BUT I’m guessing someone is... Read more

Forum topic

Hi all,

We know preparations for Greenbuild are well underway for many of you. We also know that there will be many things competing for your time while you're there. Here's one more to consider! We don't have all the details solidified yet, but wanted you to know sooner rather than later for planning purposes.

We hope you’ll... Read more

Forum topic

Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Forum topic

A couple Minnesota cities are considering adding electrification to their sustainable building policy (required for new construction receiving City financial assistance). Concerned that the market isn't ready for a full-on mandate, they are considering a more moderate approach of requiring developers/design teams to conduct an electrification... Read more

Forum topic

Is LEED Online mind-numbingly slow today for anyone else? Or is it just me? I may give up and try again tomorrow. Frustrating as I was hoping to submit a final review today. :(

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hi all,

I'm curious if anyone has insight as to the "New Federal Building Performance Standards" that were announced in May of 2021 and then referenced again when E.O. 14057 came out. The memorandum for heads of agencies that was sent out with E.O. 14057 said that the CEQ would issue these standards, but I can't find a commitment to when... Read more

Quiz

Welcome to the quiz portion of Getting Flame Retardants Out of Foam Insulation.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Summarize why and how flame retardants are used in foam insulation.
2. Elucidate the case for taking the chemicals out of foam insulation.
3.... Read more

Forum topic

How interested are you in a Sustainable MEP Leaders Summit this summer? 

Please respond to this poll ASAP, as we need to gauge interest before we finalize any details.

When: Wed. July 26 at noon to Thurs. July 27 at 1:30. 
Where: At a conference facility near Boston
Cost: $1200, which includes lodging, meals, and... Read more

Firm-wide Group

Product Guide

As with most office furniture, systems furniture can be made from unsustainable materials and use adhesives and finishes that emit formaldehyde or other hazardous compounds.

BuildingGreen-Approved Furniture

BuildingGreen approves furnishings that:

are certified to BIFMA’s multi-attribute level 3 standard, which requires low... Read more

Forum topic

Hi all,

I'm curious how various firms are approaching their own office projects, re green building certifications. I'm especially interested in medium-large firms that have multiple offices, but policies and processes from small firms may still be instructive.

Do you have a firm-wide policy or is it a case-by-case thing? Has... Read more

Forum topic

Hi everyone,

We're pitching a green wall to a client for a project in NYC and are looking for recommendations on systems/companies.  We've done them locally, but the company we've worked with only services the Boston area.  There are so many companies out there now that we'd rather go with one that's recommended.  Thanks in advance for... Read more

Author

Erika Heet is the Editor-in-Chief of BuildingGreen. She is the former Editor-in-Chief of Interiors magazine. She has held senior editor positions at Dwell and Architectural Digest, and is the author of two books on modern architecture. She has served on the boards of Greenbuild and the Sustainable Furnishings Council, as well as on juries for... Read more

Forum topic

Hello there, 

I am working on a project with indoor plants and active green walls. I would like to design lights for growing plants and people at the same time (which seems to be a non-obvious problem). 
 

I was thinking of Philips, GE, Shneider Lighting, etc. Would you recommend someone I could talk to and eventually engage... Read more

Forum topic

Hello! Does anyone know of any general contractors who produce a CSR? Is anyone aware of any general contractors who have an ESG rating? If so, what company is being utilized (i.e. EcoVadis) to get the ESG rating?